📋 PTT 文章瀏覽
https://tinyurl.com/y9ztk3mu 一個月前的舊聞 而且我找不到中文的@_@ Second airport rail link opens in Kuala Lumpur MALAYSIA: A rail link to Sultan Abdul Aziz Shah Airport in Kuala Lumpur was inaugurated on May 1. The Ministry of Transport funded the 521m ringgit project. The route branches off from the metre-gauge line that links Kuala Lumpur with Port Klang at Subang Jaya. It runs north along the alignment of an older freight line at grade for 4·1 km to Sri Subang, before climbing onto a 4 km viaduct and terminating at Terminal Skypark. Intermediate stations at Glenmarie and Sri Subang are due to open in the future. Services are operated by the KTM Komuter subsidiary of the national railway using four refurbished Class 83 electric multiple-units. The route becomes part of a newly designated Line 10, which runs between the airport and KL Sentral. 吉隆坡的梳邦機場線(舊機場)線先前開通 他的路線長這樣: 吉隆坡-梳邦再也:與吉隆坡2號線(巴生港線)共線 但中途不停巴生港線的車站 梳邦再也-梳邦機場:一部分是貨物線改建 一部分是新線 使用車輛則是翻修過的83系電車 班次尖峰15離峰30 以馬來亞鐵路驚異的服務水準 可能會讓你趕不上飛機 -- ████████◤ ◥██ ◢█◤ ◥█ ◢█◤ ████ ████ ████ █ ◢◤ █ █ █ █ ◥◢█◤ █ █ █ █ █ █ ██◤ █▄▄█ █ █ ◥◤ ████ ████ ████▋█ ◥◣ ▄▄◤ ████ Electric Railway since 1927 -- ※ 發信站: 批踢踢實業坊(ptt.cc), 來自: 112.104.30.208 ※ 文章網址: https://webptt.cc/bbs/MRT/M.1527514609.A.840.html Odakyu:轉錄至看板 Railway 05/28 21:37

推文 (2)

spiritman 東南亞一般鐵路的服務水準好像都差不多? 05/28 22:29
keat 吉隆坡機場快捷倒是蠻準點的 05/29 03:22
‹ 回 捷運板 列表